G. Installing the Main Sail:
(1) Do these steps to install the main sail:
(a) Attach the lower forward corner of the sail (the “tack”) to the shackle on
the gooseneck (see Fig 3-13).
Figure 3-13
(b) Tie the outhaul line to the lower aft corner of the sail (the “clew”). Refer
to Figure 3-14. If you have a track and car for adjusting the tension in the
foot of the sail, then attach the clew to this car.
Figure 3-14
(c) Disconnect the sail-end of the main halyard from the mast and connect it
to the top of the sail (the sail’s “head”).
Kommentare zu diesen Handbüchern